srpski
Home Software INOVA INOVA PEU Summary
Summary

 

 

Summary

Even In the last century, with the appearance of the first high-voltage power lines serious problems encountered in the telecommunication lines of that time. These initial problems were resolved in most cases by the cabling, but not for long.

The JUS standards N.CO. 101, N. CO.102 and N. CO.103 describe the protection of telecommunications structures from the dangers and disturbances stemming from the influence of power plants. The calculations are carried out according to the worst case, and are giving approximate values.

INOVA PEU - operates in two modes. One is in the software package TeleCAD-GIS, and the other as a separate application.

For the project which was done in TeleCAD-GIS, the calculation process is almost completely automated, you only need to enter the parameters of line that exerts the influence, and then you get the results as graphs and supporting tables.

Grafički prikaz proračunaTabelarni prikaz proračuna

For a project that was done in AutoCAD it is necessary to perform data entry for a line which is being watched and for line which exerts the influence, then the calculation is performed and the results are generated in an identical manner as for a project done in TeleCAD-GIS.

 

   
Contact
How to buy at INOVA ?
INOVA certificates

a
Preferred Industry Partner

a
ISV Partner

a
Value Added Reseller

a
Authorized Developer

 

 

 

Copyright © INOVA group, Banja Luka-Beograd 2001-2011.   Contact
To view this site, you need Adobe Flash Player